Project record

Fieldwork we've
put our name on.

A record of commissioned work for NAOC, GPHCDA, SPDC and government-backed programmes across the Niger Delta and beyond.

Add a photo here — open this page in the WordPress dashboard and set a Featured Image.

ProjectClientDuration / Year
Pre-dredge sounding & detailing, Nembe South 1, 2, 3 access canals – Bayelsa NAOC 7 days / 2019
Pre-dredge sounding, Azazuma 4 location canal – Rivers State NAOC 7 days / 2019
Bathymetric survey, Brass terminal access creek – Bayelsa NAOC 10 days / 2019
Bathymetric survey, Ogbainbiri flow station waterfront – Bayelsa NAOC 7 days / 2019
Aerial mapping of site for construction of saddle dams Bezaleel + Turnkey 1 month / 2020
Hydrographic survey of Ibaka River channel Solutions Hub Ltd 1 week / 2020
Topographic survey, proposed GPHCDA head office – New City, Igwuruta-Ali Greater Port Harcourt City Development Authority 14 days / 2019
Topographic survey, proposed packaged waste water treatment plant – Omuoda Aluu GPHCDA 14 days / 2019
Digital mapping services for land & swamp field projects, Niger Delta states Nigeria Agip Oil Company (NAOC) 2018-2019
Baseline mapping & integrated watershed management system (GIS approach), Enugu State SPMU / NEWMAP 18 weeks / 2019
Geotechnical survey, 18 inch x 50km oil pipeline, Ogbainbiri to Obama NAOC 35 days / 2019
Geotechnical survey, proposed GPHCDA head office site – Igwuruta-Ali GPHCDA 25 days / 2019
Topographic & geotechnical survey, 2.5km Odidi-Elps gas pipeline diversion – Delta State Desicon Engineering Services / SPDC 20 days / 2019
Drilling of 8 motorised solar boreholes with overhead tanks, across 8 LGAs – Anambra & Enugu States ATASP-1 (AfDB-assisted), Federal Ministry of Agriculture & Rural Development 2019
RC 1598237 — Corporate registration
SURCON №3559 — Registered surveyor
NIS — Full member, Nigerian Institution of Surveyors
MNMGS / COMEG — Geoscience & mining society memberships
Get in touch

Tell us the site, we'll tell you what it takes.

Whether it's a single land parcel or a 50km pipeline corridor, send us the terrain and the timeline and we'll scope the crew and instrumentation.

OfficeRukpokwu, Port Harcourt